Industrial Risk Engineering • Production Platform
Enterprise Fire & Explosion Risk Assessment

Evidence-Led Industrial Safety Intelligence

Engineered for Kevron Consulting Limited across upstream & downstream oil & gas assets. Digitizing the 30-section bulk fuel storage assessment methodology with offline field data capture, multi-hazard consequence modeling, ALARP demonstration, and cryptographically verified reporting.

✓ ISO/IEC 27001 Tenant Isolation ✓ NFPA 30 / 11 / 15 / 59A ✓ API 2610 & EI 15 ✓ NUPRC & NMDPRA Compliant
TK-101 AGO TK-102 PMS AI Consequence Model 24 Scenarios • NFPA 30 / EI 15 ● ALARP Verified (98.4%) SHA-256 Frozen Snapshot Tamper-Evident Audit Trail HASH: 8f94e2c...b71a09d [VALID] Offline-First PWA Engine 30 Sections • 308 Criteria • Sync Ready
30 Sections
308 Technical Criteria
Bulk diesel, PMS, ATK & LPG tank farms
34 Pre-Docs
AI OCR & Gap Analysis
P&IDs, Plot Plans, HAC & Fire Strategy
24 Scenarios
Consequence Modelling
Pool fire, VCE, BLEVE, jet fire & boilover
SHA-256
Frozen Report Snapshots
Tamper-evident public QR verification
Closed-Loop Engineering Lifecycle

Four-Stage Evidence-to-Assurance Workflow

11 Canonical Modules • 139 Enterprise Views
Stage 01 • Dossier

Pre-Inspection & AI OCR

Ingest 34 statutory engineering documents with AI-assisted clause extraction, ATEX zone mapping, and readiness gate checks.

Stage 02 • Fieldwork

Offline-First Field Survey

Execute 30-section inspections with IndexedDB offline journaling, GPS/QR asset tagging, and calibrated instrument logs.

Stage 03 • Modelling

Hazard & ALARP Evaluation

Compute thermal radiation contours, foam & cooling water demand, 5×5 risk matrices, and Cost-Benefit ALARP justification.

Stage 04 • Assurance

Controlled Issue & CAPA

Multi-stage QA review, cryptographic SHA-256 report sealing, public QR verification, and tracked CAPA remediation close-out.

Technical Rigor

Core Assessment Methodology

  • ✓ 30 Assessment Sections: 308 technical criteria covering site selection, tank construction, bund containment, foam systems, electrical classification, and emergency response.
  • ✓ 34 Pre-Inspection Documents: Automated document extraction, OCR parsing, and compliance gap analysis.
  • ✓ 24 Industrial Hazard Scenarios: Pool fires, vapor cloud explosions (VCE), BLEVE, boilover, and atmospheric jet fires.
  • ✓ Full ALARP Governance: Cost-Benefit Analysis (CBA), Improportion Ratio tests, and regulatory justification.
Statutory Alignment

Regulatory Codes & Security Compliance

  • ✓ International Standards: NFPA 30, NFPA 11, NFPA 15, NFPA 59A, API 2610, API 2001, EI 15.
  • ✓ Nigerian Regulatory Compliance: NUPRC Upstream & NMDPRA Midstream/Downstream Petroleum Regulations.
  • ✓ Information Security: ISO/IEC 27001 multi-client tenant isolation, SHA-256 evidence hashing, and tamper-proof audit trails.
  • ✓ Offline Resilience: IndexedDB offline field storage with deterministic conflict resolution and sync journaling.