Standard Operating Procedure (SOP) FERA Methodology
Assessments Register →
Field HSE Assessor Handbook • 10-Step Execution Lifecycle

Field Assessor End-to-End User Guide

A friendly, plain-English visual guide for Lead Assessors, Field HSE Officers, and Technical Specialists. Follow these 10 straightforward steps to conduct an industrial Fire & Explosion Risk Assessment (FERA) from initial login to final report sign-off.

Checklist Scope 30 Sections
Field Criteria 308 Criteria
Functional Tests 20 Active Tests
Statutory Records 34 Documents
01
Phase 1 • Getting Started

Accessing the Platform & Signing In

Access & Login Open Login Page →
Exact Screen URL: https://fire.kevrongroup.com/login
Default entry point for desktop and mobile

What You Do: Open your browser on your phone, tablet, or PC and navigate to the application login screen.

1. Enter Credentials

Use your official Kevron email (e.g. assessor@kevrongroup.com) and your secure field password.

2. Fast Field Access

MFA/2FA is turned off by default for rapid field logins. You go straight to your dashboard upon password verification.

3. Quick Search (Ctrl+K)

Once logged in, press Ctrl+K anywhere to search for any asset, tag, or page instantly.

Pictorial Preview: Secure Workspace Login
Live Interface Layout
KEVRON FireRisk AI™
Assessor Email
assessor@kevrongroup.com
Password
••••••••••••
Sign In to Field Workspace →
• Screen Highlights:
  • Sign in with your authorized corporate email and password provided by your system administrator.
  • Direct redirect takes you to https://fire.kevrongroup.com/dashboard without multi-step delays.
  • Session stays remembered on your tablet for offline continuity.
02
Phase 1 • Safety Gate

Pre-Assessment Safety Readiness & PTW Clearance

Exact Screen URL: https://fire.kevrongroup.com/assessments/1/readiness
Mandatory pre-entry checklist before physical site entry

What You Do: Before you physically step into tank bunds, pump manifolds, or loading gantries, verify the 4 mandatory life-safety items:

1. Valid PTW

Permit-to-work countersigned by the Terminal Operations Manager.

2. 0% LEL Gas Test

Multi-gas monitor reads 0% LEL combustible gas and 20.9% Oxygen.

3. Mandatory PPE

Anti-static boots, FRC coveralls, hard hat, safety glasses, personal gas clip.

4. Ex Device Rule

Standard phones are NOT Ex-rated. Take photos from safe unclassified areas.

Pictorial Preview: Site Safety Readiness & Clearance Verification
Safety Clearance Active
⚠ Hazardous Zone Notice: Ordinary phones cannot be taken into Zone 0/1 without gas testing & hot/cold work permits.
PTW Permit Reference PTW-2026-088-APPROVED
Countersigned by: Terminal HSE Supv • Valid until 18:00 hrs
Atmospheric Gas Clearance 0% LEL • 20.9% O₂
Dräger X-am 5000 • Calibration valid • Zero flammable vapor
03
Phase 2 • Documentary Audit

Section 03: Pre-Assessment Statutory Records (34 Documents)

Exact Screen URL: https://fire.kevrongroup.com/assessments/1/pre-docs
Audit 34 statutory compliance certificates before physical inspection

What You Do: Review the 34 required engineering and statutory documents across 4 core compliance buckets:

1. Engineering Basis

P&IDs, As-Built Plot Plans, Hazardous Area Classification drawings (EI 15 / IEC 60079).

2. Integrity Dossiers

API 650/653 tank inspection reports, ultrasonic thickness surveys, PRV test certificates.

3. Fire Protection Logs

NFPA 25 pump annual flow test curves, foam concentrate lab quality certificates, deluge flow tests.

4. Statutory Licenses

Federal/State Fire Service Certificate, NMDPRA Bulk Storage License, approved EIA dossier.

Pictorial Preview: Section 03 Statutory Pre-Docs Audit Register
34/34 Indexed
DOC-01: Approved Process Plot Plan & P&IDs (Rev 4)
TotalEnergies Marketing Nigeria • Verified As-Built
✓ VERIFIED CURRENT
DOC-14: NFPA 25 Annual Fire Pump Test Certification
Flow Test Curve Attached • Churn, 100%, 150% verified
✓ VERIFIED CURRENT
DOC-28: NMDPRA Bulk Storage Operating License
License No: NMDPRA/OPS/2025/1102 • Active until Dec 2026
✓ VERIFIED CURRENT
04
Phase 3 • Physical Site Inspection

Sections 04–22: Answering the 308 Technical Field Questions

Checklist Inspection Open Sections Grid →
Exact Screen URL: https://fire.kevrongroup.com/assessments/1/sections
Select any section to evaluate individual criteria

What You Do: As you walk around each bulk tank, pump manifold, bund, and loading rack, evaluate each question using the 5 standardized compliance buttons:

[C] Compliant

Fully meets API/NFPA code

[PC] Partial

Minor maintenance finding

[NC] Non-Compliant

Creates a hazard • triggers CAPA

[NA] Not Applicable

Feature not on this facility

[NV] Not Verified

Awaiting active test/document

1. Assign Defect Severity: Choose High (Critical), Medium, or Low (Advisory).

2. Record Specific Observations: E.g., "Tank TK-102 secondary weather shield rim seal shows 12mm torn gap along north-east sector."

3. Outline Engineering Remedy: E.g., "Replace degraded wiper seal and conduct combustible vapor survey per API 653."

4. Advance Smoothly: Click Save & Continue → to auto-advance to the next question.

Pictorial Preview: Live Question Execution (Criterion 05.01)
API 650 App. C
Section 05 • Tank Design • Question 05.01
Is the floating roof secondary rim seal in good physical condition with continuous vapor-tight contact around the entire perimeter?
C
PC
NC ✓
NA
NV
Field Assessor Findings:

Secondary weather shield torn on North-East perimeter. Potential flammable vapor leakage path present.

05
Phase 3 • Asset Traceability

Equipment Tag Scanner & Photographic Evidence

Exact Screen URL: https://fire.kevrongroup.com/assets/scanner
Aim camera or enter asset tag to pull equipment dossier

What You Do: Link your findings directly to the physical equipment item (e.g. Tank TK-101, Pump P-201A, or Hydrant HYD-04):

1. Live Camera Scan

Click Activate Camera to aim your device at the QR/Barcode plate on the equipment shell.

2. Scan from Photo

Snap a photo of the nameplate and upload it via Scan from Photo. The tag is automatically extracted.

3. Manual Tag Entry

Type TK-101 or pick from the recent equipment chips for instant 100% offline resolution.

Pictorial Preview: Optical QR Reticle & Asset Resolution
Scanner Active
✓ SCANNED: TK-101
Diesel Bulk Storage Tank
24m Diameter Capacity: 7,500 m³ Tag Resolved
06
Phase 4 • Active Safeguards Testing

Section 23: Functional Safety Tests & Measurement Record (20 Tests)

Functional Safety Tests Open Functional Tests →
Exact Screen URL: https://fire.kevrongroup.com/assessments/1/test-auth
Witness and record real functional performance tests

What You Do: Witness or verify the 20 active functional safeguard tests required by Section 23 of the Master Checklist:

1. ESD Valve Trip Timing

Verify full-stroke emergency closure time: must close completely in < 30 seconds per API 2350.

2. High-High Level Alarms

Simulate overfill trip on independent radar or vibrating fork transmitter to verify automatic pump cutoff.

3. Foam Induction Accuracy

Test proportioner accuracy (3.0% to 3.9% induction for 3% AFFF concentrate) using refractometer.

Pictorial Preview: Functional Safety Tests Execution Matrix
20/20 Criteria
Test 23.01: Inlet ESD Valve Full Stroke Closure
Valve XV-101 • Measured: 18.4s (Pass benchmark < 30s)
PASS ✓
Test 23.06: Foam Proportioner Concentration
Induction Ratio: 3.12% • Refractometer calibrated
PASS ✓
07
Phase 4 • Hydraulic Engineering

Section 24: Firewater Hydraulic Testing & Pump Performance Curves

Hydraulics & Pump Curve Open Hydraulics Screen →
Exact Screen URL: https://fire.kevrongroup.com/assessments/1/hydraulic
Log 12 ring main test points and NFPA 20 pump curves

What You Do: Record flow and pressure data at the most remote hydrant on the terminal ring main, plus the 3 NFPA 20 pump curve duty points:

0% Flow (Churn) Pressure ≤ 140% rated head
100% Rated Flow Design pressure @ 100% head
150% Peak Flow Pressure ≥ 65% rated head
Pictorial Preview: NFPA 20 Fire Pump Performance Curve
Curve Generated
Duty Pump FP-01 (100% Electric + 100% Diesel Standby)
Churn: 11.2 bar
100%: 9.5 bar
150%: 7.8 bar
✓ NFPA 20 Compliance: Satisfactory (<5% degradation)
08
Phase 4 • Risk Quantification

Section 25: Credible Accident Scenarios & ALARP Risk Heatmap

Risk Heatmap & ALARP Open ALARP Scenarios →
Exact Screen URL: https://fire.kevrongroup.com/assessments/1/scenarios
Evaluate 24 major accident scenarios and residual risk

What You Do: Review the 24 starter credible accident scenarios (Rim Seal Fire, Full Surface Fire, Bund Pool Fire, Loading Gantry Spray Fire). The platform automatically maps pre-event prevention and post-event mitigation barriers onto an ISO 31000 5×5 risk matrix.

Pictorial Preview: ISO 31000 5×5 Risk Heatmap & ALARP Demonstration
ALARP Demonstrated
Scenario SC-01: Tank TK-101 Rim Seal Flammable Fire
Initial: Likelihood 3 × Consequence 4 = High (12) → Mitigated: ALARP (4)
✓ ALARP All Safeguards Verified
09
Phase 5 • Intervention & Action

Immediate Stop-Work Escalation & CAPA Action Register

Stop-Work Alert URL:
https://fire.kevrongroup.com/assessments/1/stop-work
CAPA Action Register URL:
https://fire.kevrongroup.com/actions

What You Do:

Imminent Danger (Stop-Work Authority):

If you spot an active fuel leak, bypassed high-level cutoff, or uncertified hot work near bulk fuel, trigger the Stop-Work Alert immediately. Broadcast over UHF site radio.

Routine Remediation (CAPA Tracking):

Every Non-Compliant [NC] item automatically flows into the CAPA Register at https://fire.kevrongroup.com/actions with assigned owners, due dates, and mitigation controls.

Pictorial Preview: Stop-Work Banner & CAPA Card
Safety Alert Active
STOP-WORK ALERT SWA-01: Tank TK-102 Rim Seal Rupture
ESCALATED TO GM
CAPA-2026-041: Replace Degraded Wiper Seal (TK-102)
Owner: Maintenance Supt • Priority: Critical • Due: 7 Days
IN PROGRESS
10
Phase 5 • Quality Gate & Delivery

Section 30: 5-Role Attributable Sign-off & Controlled Report Export

5-Role Sign-off URL:
https://fire.kevrongroup.com/assessments/1/submit
Controlled Reports Hub URL:
https://fire.kevrongroup.com/reports

What You Do: Complete the quality pre-flight check, capture digital signatures, and export the official corporate report:

1. Pre-Flight Quality Check

The platform automatically validates: zero unanswered questions, all NC items linked to CAPA, pump curves plotted, and photos attached.

2. 5-Role Cryptographic Signatures

Digital signatures recorded for: Field HSE Assessor, Terminal Manager, Fire Protection Specialist, Technical Reviewer, and Authorised Approver.

Corporate Report Deliverables:

Export high-resolution PDF or corporate DOCX matching Kevron's official template (Arial 11pt, document control number DOC-FRA-2026-KOKO-001-REV0).

Pictorial Preview: Controlled Report Issue Certificate
Issued • Immutable
Document Control No: DOC-FRA-2026-KOKO-001-REV0
Koko Bulk Fuel Storage & Loading Terminal FERA Final Report
SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Complete Assessor URL Reference Directory

All 10 Lifecycle Stages
Step Workflow Stage Checklist Section Complete Direct URL Quick Navigation
01 Platform Sign-In Login Portal https://fire.kevrongroup.com/login Open →
02 Safety Readiness & PTW Sec 01–02 https://fire.kevrongroup.com/assessments/1/readiness Open →
03 Pre-Docs Audit (34 Records) Sec 03 https://fire.kevrongroup.com/assessments/1/pre-docs Open →
04 Field Checklist (308 Questions) Sec 04–22 https://fire.kevrongroup.com/assessments/1/sections Open →
05 Equipment QR Tag Scanner Sec 28 https://fire.kevrongroup.com/assets/scanner Open →
06 Functional Safety Tests (20 Tests) Sec 23 https://fire.kevrongroup.com/assessments/1/test-auth Open →
07 Hydraulic Testing & Pump Curve Sec 24 https://fire.kevrongroup.com/assessments/1/hydraulic Open →
08 Risk Scenarios & ALARP Heatmap Sec 25 https://fire.kevrongroup.com/assessments/1/scenarios Open →
09 Stop-Work Alert & CAPA Register Section 27 (Stop-Work) https://fire.kevrongroup.com/assessments/1/stop-work Open →
10 5-Role Sign-off & Reports Hub Sec 30 https://fire.kevrongroup.com/reports Open →