Field Assessor End-to-End User Guide
A friendly, plain-English visual guide for Lead Assessors, Field HSE Officers, and Technical Specialists. Follow these 10 straightforward steps to conduct an industrial Fire & Explosion Risk Assessment (FERA) from initial login to final report sign-off.
Accessing the Platform & Signing In
https://fire.kevrongroup.com/login
What You Do: Open your browser on your phone, tablet, or PC and navigate to the application login screen.
Use your official Kevron email (e.g. assessor@kevrongroup.com) and your secure field password.
MFA/2FA is turned off by default for rapid field logins. You go straight to your dashboard upon password verification.
Once logged in, press Ctrl+K anywhere to search for any asset, tag, or page instantly.
- Sign in with your authorized corporate email and password provided by your system administrator.
- Direct redirect takes you to
https://fire.kevrongroup.com/dashboardwithout multi-step delays. - Session stays remembered on your tablet for offline continuity.
Pre-Assessment Safety Readiness & PTW Clearance
https://fire.kevrongroup.com/assessments/1/readiness
What You Do: Before you physically step into tank bunds, pump manifolds, or loading gantries, verify the 4 mandatory life-safety items:
Permit-to-work countersigned by the Terminal Operations Manager.
Multi-gas monitor reads 0% LEL combustible gas and 20.9% Oxygen.
Anti-static boots, FRC coveralls, hard hat, safety glasses, personal gas clip.
Standard phones are NOT Ex-rated. Take photos from safe unclassified areas.
Section 03: Pre-Assessment Statutory Records (34 Documents)
https://fire.kevrongroup.com/assessments/1/pre-docs
What You Do: Review the 34 required engineering and statutory documents across 4 core compliance buckets:
P&IDs, As-Built Plot Plans, Hazardous Area Classification drawings (EI 15 / IEC 60079).
API 650/653 tank inspection reports, ultrasonic thickness surveys, PRV test certificates.
NFPA 25 pump annual flow test curves, foam concentrate lab quality certificates, deluge flow tests.
Federal/State Fire Service Certificate, NMDPRA Bulk Storage License, approved EIA dossier.
Sections 04–22: Answering the 308 Technical Field Questions
https://fire.kevrongroup.com/assessments/1/sections
What You Do: As you walk around each bulk tank, pump manifold, bund, and loading rack, evaluate each question using the 5 standardized compliance buttons:
Fully meets API/NFPA code
Minor maintenance finding
Creates a hazard • triggers CAPA
Feature not on this facility
Awaiting active test/document
1. Assign Defect Severity: Choose High (Critical), Medium, or Low (Advisory).
2. Record Specific Observations: E.g., "Tank TK-102 secondary weather shield rim seal shows 12mm torn gap along north-east sector."
3. Outline Engineering Remedy: E.g., "Replace degraded wiper seal and conduct combustible vapor survey per API 653."
4. Advance Smoothly: Click Save & Continue → to auto-advance to the next question.
Secondary weather shield torn on North-East perimeter. Potential flammable vapor leakage path present.
Equipment Tag Scanner & Photographic Evidence
https://fire.kevrongroup.com/assets/scanner
What You Do: Link your findings directly to the physical equipment item (e.g. Tank TK-101, Pump P-201A, or Hydrant HYD-04):
Click Activate Camera to aim your device at the QR/Barcode plate on the equipment shell.
Snap a photo of the nameplate and upload it via Scan from Photo. The tag is automatically extracted.
Type TK-101 or pick from the recent equipment chips for instant 100% offline resolution.
Section 23: Functional Safety Tests & Measurement Record (20 Tests)
https://fire.kevrongroup.com/assessments/1/test-auth
What You Do: Witness or verify the 20 active functional safeguard tests required by Section 23 of the Master Checklist:
Verify full-stroke emergency closure time: must close completely in < 30 seconds per API 2350.
Simulate overfill trip on independent radar or vibrating fork transmitter to verify automatic pump cutoff.
Test proportioner accuracy (3.0% to 3.9% induction for 3% AFFF concentrate) using refractometer.
Section 24: Firewater Hydraulic Testing & Pump Performance Curves
https://fire.kevrongroup.com/assessments/1/hydraulic
What You Do: Record flow and pressure data at the most remote hydrant on the terminal ring main, plus the 3 NFPA 20 pump curve duty points:
Section 25: Credible Accident Scenarios & ALARP Risk Heatmap
https://fire.kevrongroup.com/assessments/1/scenarios
What You Do: Review the 24 starter credible accident scenarios (Rim Seal Fire, Full Surface Fire, Bund Pool Fire, Loading Gantry Spray Fire). The platform automatically maps pre-event prevention and post-event mitigation barriers onto an ISO 31000 5×5 risk matrix.
Immediate Stop-Work Escalation & CAPA Action Register
https://fire.kevrongroup.com/assessments/1/stop-work
https://fire.kevrongroup.com/actions
What You Do:
If you spot an active fuel leak, bypassed high-level cutoff, or uncertified hot work near bulk fuel, trigger the Stop-Work Alert immediately. Broadcast over UHF site radio.
Every Non-Compliant [NC] item automatically flows into the CAPA Register at https://fire.kevrongroup.com/actions with assigned owners, due dates, and mitigation controls.
Section 30: 5-Role Attributable Sign-off & Controlled Report Export
https://fire.kevrongroup.com/assessments/1/submit
https://fire.kevrongroup.com/reports
What You Do: Complete the quality pre-flight check, capture digital signatures, and export the official corporate report:
The platform automatically validates: zero unanswered questions, all NC items linked to CAPA, pump curves plotted, and photos attached.
Digital signatures recorded for: Field HSE Assessor, Terminal Manager, Fire Protection Specialist, Technical Reviewer, and Authorised Approver.
Export high-resolution PDF or corporate DOCX matching Kevron's official template (Arial 11pt, document control number DOC-FRA-2026-KOKO-001-REV0).
e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855Complete Assessor URL Reference Directory
All 10 Lifecycle Stages| Step | Workflow Stage | Checklist Section | Complete Direct URL | Quick Navigation |
|---|---|---|---|---|
| 01 | Platform Sign-In | Login Portal | https://fire.kevrongroup.com/login | Open → |
| 02 | Safety Readiness & PTW | Sec 01–02 | https://fire.kevrongroup.com/assessments/1/readiness | Open → |
| 03 | Pre-Docs Audit (34 Records) | Sec 03 | https://fire.kevrongroup.com/assessments/1/pre-docs | Open → |
| 04 | Field Checklist (308 Questions) | Sec 04–22 | https://fire.kevrongroup.com/assessments/1/sections | Open → |
| 05 | Equipment QR Tag Scanner | Sec 28 | https://fire.kevrongroup.com/assets/scanner | Open → |
| 06 | Functional Safety Tests (20 Tests) | Sec 23 | https://fire.kevrongroup.com/assessments/1/test-auth | Open → |
| 07 | Hydraulic Testing & Pump Curve | Sec 24 | https://fire.kevrongroup.com/assessments/1/hydraulic | Open → |
| 08 | Risk Scenarios & ALARP Heatmap | Sec 25 | https://fire.kevrongroup.com/assessments/1/scenarios | Open → |
| 09 | Stop-Work Alert & CAPA Register | Section 27 (Stop-Work) | https://fire.kevrongroup.com/assessments/1/stop-work | Open → |
| 10 | 5-Role Sign-off & Reports Hub | Sec 30 | https://fire.kevrongroup.com/reports | Open → |